Day 13


The rough plumbing was finished today. They filled up the bathtub and said to leave it filled till the inspector came to check for any leaks.

Here’s the new shower control valve. It is the type that can not cause hot water to come out when someone flushes a toilet. These are the only kind allowed now.

Over the weekend, Dan installed the datalines. Here’s a look at some of his work. The datalines are in blue.

Tired Falyn

You can always tell when Falyn is getting tired because she grabs her hair like this and holds on to it.