Day 18

More electrical work took place today with new outlets being placed in the garage.

A special outlet was added for the FiOS box.

The power switch for the outside light was fixed.

Outlets were placed in the ceiling for the garage door openers.

A new outlet and light was also placed in the attic.

The extra layer of wood that was on the floor in the old bonus room area was removed to make the floor level with the rest of the house.

Here’s a look at the new electrical box from the outside.