Day 23 – Prep For Tile – Pool Construction

Today the workers create a band with mortar where the tile will go. The tile will be at the waterline all around the pool, except for where the slide structure is located. Above the waterline on the spa and back part of the pool will be ledgestone.



Leave a Reply

Your email address will not be published. Required fields are marked *