Day 53 – Pool Construction – Pool Equipment Connected

That got the pool equipment hooked up today and we turned on the slide, waterfall and spillways!



Today was also the first time the pool lights were turned on.

One Reply to “Day 53 – Pool Construction – Pool Equipment Connected”

  1. Looks great, the kids are thrilled and I understand that they can’t be stoped, brrr cold water.
    You must be so relieved that this chapter is finaly done.
    The luminated pool looks just wonderful….

    Greetings Sabine

Leave a Reply

Your email address will not be published. Required fields are marked *