The guy who is doing the plans for our bonus room remodel came by today to measure the house. He was her for around 1 1/2 hours and measured the entire house – inside and out. He said it will take 1-2 weeks to get the preliminary plans done. At that point, we will be able to give them to the contractor to work up an estimate for the materials and labor.