End of Day 3

It doesn’t look much different from the outside, but progress was made today. They plumber put in a drain to the sewer line. This pipe will eventually be inside the garage wall.

They also worked on assembling the steel in the trench in the garage. Once they finish this, it will have to be inspected before the concrete can be poured.

One Reply to “End of Day 3”

  1. Isn’t it fun to see the plumbing that is usually covered by the walls and floor and ceiling? very cool.

    And the steel in the trench–that’s amazing looking! Does it have to be that way because of where you live (earthquakes)? Or is all concrete that way, and I just didn’t know it?