Day 7

A lot of work went on today! It was day 1 for the framers. They arrived at 7 am and didn’t leave until 7 pm. They removed the old beam and put up the new one.


Finished framing on the new walls in the garage.

Removed everything but the studs from the garage wall facing the street and redid it.


Framed the floor for the new bedrooms where the balcony used to be.



The tub for the new bathroom was also delivered.

My favorite part of today’s work is that I no longer have to sqeeze through the front door! Since they finished the new garage wall, they took down the bracing that was blocking in the front door.