Day 20


The window for the twins’ room was installed.

The rest of the shear panel was installed in the garage and upstairs.



Wrapping of the outside in preparation for siding was started.

The old door to the bonus room was removed and the opening was cut out for the new hallway.

Leave a Reply

Your email address will not be published. Required fields are marked *