Pool Construction – Day 8 – More electrical and concrete demo on side of house

They got the electrical all pretty much done today, except for the stub for the BBQ. Demo was also done to the concrete on the side of the house. This was needed so they could run the gas line out to the meter.



Leave a Reply

Your email address will not be published. Required fields are marked *